Advanced process integration Assignment, CU, Malaysia Determine the minimum fresh water and minimum wastewater targets for the above system using water cascade analysis
University | Curtin University (CU) |
Subject | Advanced process integration |
Task A: Wastewater in acrylonitrile production Figure 1 shows a process flow diagram for ‘ 1^ AN is produced in a fluidized-bed reactor via vapor-phase ammoxidation of propylene. The reaction is a single pass, with an almost complete conversion of propylene. The reactor is operated at 2 atm and 450°C, with the stoichiometry shown in the below equation.
Task A-1 Determine the minimum fresh water and minimum wastewater targets for the above system using water cascade analysis (WCA). [35%]
Task A-2 [UL02] Based on the results obtained from Task A-1, redraw Figure 1 for this acrylonitrile production. [5%]
Task A-3 (ULO1] Identify and explain two mass exchange techniques that can be used to separate water from the aqueous layer. Make a comparison between these two techniques and identify the better technique for water separation. [15%]
Get Solution of this Assessment. Hire Experts to solve this assignment for you Before Deadline.
Recent Solved Questions
- Law Research paper, UM, Malaysia What is the relationship between perceived easiness and excessive spending behavior among young adult by using e-wallet payment method
- MPU3223_V2 Entrepreneurship Assignment OUM Malaysia Choose a Popular Travel Agency in Malaysia Such as Reliance Travel
- MBOC 7013: Financial Management Assignment, IUMW, Malaysia You are the Chief Investment Officer of an International Investment Firm
- BBMC4103: Change Management Assignment, OUM, Malaysia Few firms can thrive in the face of constant change Although change is difficult to accept, it is your responsibility
- Find an initial solution to the following transportation problem: Optimization Technique Assignment, UMP, Malaysia
- MPHR7113 Assignment 1: Marketing Management IKEA Malaysia Retention Strategy – City University Malaysia
- Procurement Management Case Study, TARC, Malaysia Critically discuss pertaining to the FIVE (5) important viewpoints on what makes a Good Project Manager to decide on the above matter
- Safety, Health and Welfare Assignment, AMU, Malaysia What are the lessons we have learned in the past from handling Covid 19 Pandemic to prepare for any anticipated new outbreak
- Entrepreneurship and Innovation Assignment, SU, Malaysia Many organizations faced challenges during the COVID-19 pandemic, and some found ways to overcome them but some failed
- ECW1101: Introductory Microeconomics Assignment, MUM, Malaysia A price ceiling that is below the perfectly competitive equilibrium price creates a deadweight loss because it leads