AICT004-3-2-NWN: Networks and Networking Assignment, APU, Malaysia You are required to design and apply an IP addressing scheme for the topology shown for The Evergreen Resort network
University | Asia Pacific University (APU) |
Subject | AICT004-3-2-NWN: Networks and Networking |
SCENARIO
You are required to design and apply an IP addressing scheme for the topology shown for The Evergreen Resort network in Figure 1. You will be given one class C block of IP addresses that you must subnet and provide the IP addressing plan for the network.
Using Packet Tracer, you must first create the topology diagram of the network as shown in Figure 1. Once the topology diagram is done, configure each device according to your proposed IP addressing scheme. When the configuration is complete, use the appropriate commands to verify that the network is working properly.
Part A : Topology Design
- There are total of 3 branch routers, and 1 offsite router for backup. All router to router connections are using Serial interfaces.
- LAN connection in the 3 branches – Kuala Lumpur (KL), Johor Bahru (JB) and Penang are using copper cables (with Fast Ethernet interfaces)
- There are wireless LAN connection provided in KL, JB and Penang branch using WiFi technology.
- Connection from Offsite router to the servers are using fiber optic cables (with Gigabit Ethernet interfaces)
Draw the topology diagram in Cisco Packet Tracer, following the specific requirements
Part B: Packet Tracer Configuration
- Perform basic configuration on Penang, JB, KL and Offsite routers to demonstrate the following configuration skills:
- Basic router/switch configuration (hostname, banner motd, passwords etc.). Please use “cisco” for all passwords.
- Static and Dynamic IPv4 Addressing
- Wireless configuration
- Routing
- Verify the network configuration by using PING and Tracert command. Troubleshoot the network if any of your attempt is unsuccessful (failed).
Part C: Report – Network Topology / IP Addressing
Each student is required to provide an individual report to justify the network topology and IP addressing scheme used in the network design. Relevant citations and referencing are to be used to support the design.
Get Solution of this Assessment. Hire Experts to solve this assignment for you Before Deadline.
Get Help By Expert
Seeking Online Assignment Assistance in Malaysia? Discover Assignment Helper MY - Your go-to platform for top-notch academic support! APU students at Asia Pacific University can now access expert aid in AICT004-3-2-NWN: Networks and Networking Assignment. Get customized solutions, timely delivery, and unparalleled guidance from qualified professionals. You also avail of our expert writers for Coding Assignment Help.
Recent Solved Questions
- SMP10803: Principles of Marketing Assignment, UMP, Malaysia You are planning to venture into one of the agribusinesses in the area in which you live Discuss 3 (THREE) major external forces that will impact your future business.
- Pengurusan Pendidikan Assignment, UTHM, Malaysia Isu bersara awal dalam kalangan pendidikan sama ada guru atau pentadbir di institusi pendidikan semakin meningkat sejak akhir-akhir ini
- MPU3192: Pilih mana-mana tokoh yang disenaraikan diatas (boleh memilih lebih daripada seorang tokoh): Falsafah Dan Isu Semasa 2, Assignment, OUM, Malaysia
- Financial Accounting Assignment, UM, Malaysia Describe the business background and organizational structure of the selected company
- BAM7014: Accounting for Managers Assignment, MMU, Malaysia Prepare a briefing report on the financial implications of the managing director’s proposal to outsource some
- FAR210: Financial Accounting 3 Assignment, UiTM, Malaysia Dasz Bhd was incorporated in 2018 with a registered capital of RM100,000,000. The company involves in the trading
- Entrepreneurship and Innovation Assignment, SU, Malaysia Many organizations faced challenges during the COVID-19 pandemic, and some found ways to overcome them but some failed
- Certified Financial Planner Assignment, UTAR, Malaysia Some weeks ago, you (Danny Lim) a Certified Financial Planner (CFP) and a licensed Financial Planner met your old friend
- Suppose the PDA P = (Q= {go, q1}, Σ={0,1}, r={Zo, X}, &, qo, z=Zo, F={q1} ) has the following transition function: Automata theory, Assignment, UMS, Malaysia
- Industrial Informatics Research Paper, IIUM, Malaysia What is the role of social media inclusion in elevating brand positioning across the Malaysian market in terms