A Feasibility study of Photovoltaic Solar Power Plant: Financial Management Assignment, UTP, Malaysia
University | Universiti Teknologi PETRONAS (UTP) |
Subject | Financial Management |
Question 3 :
A Feasibility study of Photovoltaic Solar Power Plant
Benchmark analysis of Energy production costs
Energy Analysis
The energy assessment has been analyzed on the basis of the benchmark analysis in part 3.1 as well as the climatic information in segment 2.1. The intended capacity of the power plant is 100MW, implying that the power plant should consistently produce 100MW of electricity to the power grid. Unfortunately, the irradiation of solar energy varies on a daily basis as well as an hourly basis. So, achieving constant electricity generation is tough. Table 3 displays the energy capacity in terms of the projected solar power system. According to the capability of energy analyses, the determined capacity of the proposed power plant is 100MW, and the power provided to the local power grid is determined to be 140,155MWh.
Financial Viability
Economic feasibility is the capacity to produce enough revenue to pay operational expenses, and debts, when relevant, to permit growth and conserve service quality. As a result, the economic feasibility of the proposed power plant is reviewed in this section.
The financial parameters are the factors that determine whether or not a project is financially viable. The table below shows these financial parameters. The financial viability process depends on the contribution of the appropriate assumptions about the project life, the inflation rate, the reinvestment rate, and the discount rate.
The table below summarizes all costs and debt payments on a yearly basis. The project needs to pay $9,222,748 per year.
Stuck in Completing this Assignment and feeling stressed ? Take our Private Writing Services.
Get Help By Expert
Get outstanding grades in your Financial Management Assignment on "A Feasibility Study of Photovoltaic Solar Power Plant" with our assignment helper online in Malaysia. Our professional essay helper online provides expert guidance and support. Malaysian students can trust our services for high-quality academic help. Contact us today to excel in your course!
Recent Solved Questions
- MGT508: Select a specific Operation for an organization (1) that you work for, or (2) that you are familiar with: OPERATIONS MANAGEMENT Assignment, HU, Malaysia
- Mass Transfer Assignment, MUM, Malaysia Sulfur dioxide (SOâ‚‚) is a harmful gas primarily emitted from fossil fuel combustion at the TAPCO power plant
- BBF305/03: Investment and Portfolio Management Assignment, WOU, Malaysia Evaluate the three mutual funds using Sharpe and Treynor measure and Given the risk-free rate is 5%
- BMG302/03: The Johari Window is a model that helps individuals understand their relationships with themselves: Organizational Behavior Assignment, WOU, Malaysia
- FIN2102: Financial Management Report, IIU, Malaysia Critics of international diversification observe that it does not protect investors against short-term market crashes
- Advanced Diploma in Paediatric Nursing Assignment, MU, Malaysia Identifying the significant clinical information and specific management of children with acute glomerulonephritis
- AUD339: Auditing Assignment, UiTM, Malaysia In the past, there have been issues regarding how internal auditors want to audit the company and profession in relation
- Human Resources Management Thesis, UTM, Malaysia I have decided to conduct a study on occupational stress and work-life balance in the private sector
- BBUI3103: Employment and Industrial Law Assignment, OUM, Malaysia Differentiate between dismissal and termination and consider whether the grounds of dismissal and termination
- SPE351: theory and practice Assignment, UITM, Malaysia: Students need to identify one sport matching schedule and briefly explain the match schedule used in that sport: Competitive sport