Advanced process integration Assignment, CU, Malaysia Determine the minimum fresh water and minimum wastewater targets for the above system using water cascade analysis

University Curtin University (CU)
Subject Advanced process integration

Task A: Wastewater in acrylonitrile production Figure 1 shows a process flow diagram for ‘ 1^ AN is produced in a fluidized-bed reactor via vapor-phase ammoxidation of propylene. The reaction is a single pass, with an almost complete conversion of propylene. The reactor is operated at 2 atm and 450°C, with the stoichiometry shown in the below equation.

Advanced process integration Assignment, CU, Malaysia Determine the minimum fresh water and minimum wastewater targets for the above system using water cascade analysis

Advanced process integration Assignment, CU, Malaysia Determine the minimum fresh water and minimum wastewater targets for the above system using water cascade analysis

Task A-1 Determine the minimum fresh water and minimum wastewater targets for the above system using water cascade analysis (WCA). [35%]

Task A-2 [UL02] Based on the results obtained from Task A-1, redraw Figure 1 for this acrylonitrile production. [5%]

Task A-3 (ULO1] Identify and explain two mass exchange techniques that can be used to separate water from the aqueous layer. Make a comparison between these two techniques and identify the better technique for water separation. [15%]

Malaysia Assignment Help

Get Solution of this Assessment.

Hire experts to solve your assignment before the deadline with guaranteed quality.

Answer Preview

Need the complete answer?

Need a custom solution for this question?

Share your module details and get fast, original academic support from our team.