TBE103/03: Environmental Science and Design Report, WOU, Malaysia Green and sustainable development is globally promoted, and “Go Green” initiatives are also widely being encouraged in the country
| University | Wawasan Open University (WOU) |
| Subject | TBE103/03: Environmental Science and Design |
Question
Green and sustainable development is globally promoted, and “Go Green” initiatives are also widely being encouraged in the country. The elements of the environmental design have played major roles in providing conducive environments to the occupants of a building. Identify a green residential block or an office tower that has shared common facilities (both indoor and outdoor). You are required to produce a report about various modern landscaping with its sustainable design concept that covers the façades and envelops of the green building that you have selected. The report should include the following points:
a) Background and history of the selected green building.
b) Layout and design principles of the landscaping scheme used in the building.
c) The roles and functions of the vertical green wall, sky or roof garden, green roof, hanging garden, and/or poolside garden where applicable.
d) Identification of the types of plants available, and their characteristics, and provide your comments about the plant selection and their maintenance used for the areas in (c).
e) Justification and discussion on how the green construction designs contribute to promoting natural cooling and natural ventilation.
f) Discussion of any limitations and suggestions to further improve the sustainable environmental design used in the building.
You are required to include the actual photos of the relevant subjects discussed (e.g. vertical wall or façade with greenery, indoor gardens, etc.) to best illustrate the chosen location. However, try to keep the photos’ size small (recommended size for each photo is about 500 x 300 pixels). A suggested number of words is about 4,000.
Get Help By Expert
Looking to ace your Environmental Science and Design report (TBE103/03) at WOU? Our platform, Assignment Helper MY, connects you with skilled online assignment writers. Get expert assistance in crafting a top-notch report that delves into environmental intricacies. Elevate your academic journey with us today!
Recent Solved Questions
- ASM657: Innovative Thinking Strategy Case Study, UiTM, Malaysia
- You are working as a Human Resources Manager in a medium-sized company: Quantitative Methods for Business Research, Assignment, MSU, Malaysia
- Database Systems Report, MMU, Malaysia You and your group of friends have recently decided to launch a startup company
- Basic Agriculture Economic Assignment, SU, Malaysia
- BFI3313: Choose ONE (1) financial institution from the banking industry that operates in Malaysia: FINANCIAL AND MONETARY SYSTEMS Assignment, QIU, Malaysia
- Energy Fuel and Power Technology Division Assignment, UON, Malaysia You have been assigned to conduct an evaluation of the bioenergy opportunity by selecting ONE source of biomass
- Educational Assessment: Test Design and Evaluation
- Legislation Assignment, OUM, Malaysia What is the Factory and Machine Act 1967? Why was the promulgation of this Act necessary? Who is the enforcement authority
- Determine the payback period for both Project ABC and Project XYZ: Managerial Accounting Assignment, UPNM, Malaysia
- Environmental Science Assignment, UON, Malaysia Enzim E memangkin hidrolisis substrat S Kinetik E (V0) sebagai satu fungsi S diukur dan data diperoleh seperti dalam Jadual